1.
I got an app for my cell
To remind me to be mindful
It chimes me on the stroke of every hour
Tsk. Tut. The censor swats.
Another way I make my phone my master.
2.
New England Patriots football squad
Bearer of scorn and adoration
of intensity unrivaled by zeal for God or country
Champions of America's paragon sport
Damn they're smug.
Showing posts with label month 1. Show all posts
Showing posts with label month 1. Show all posts
Thursday, September 10, 2015
Thursday, August 20, 2015
Haibun 2
Black Sheen, Olive Green
Black sheen, olive green cicada flaps.
Floodlight flips on. Crickets pulse out, a thousand miniscule glass stoppers spun in bottle necks.
Cicada buzzes. It's twitching on its back, its wings pummeling the composite decking, its pale underbelly defenseless.
Cicada flips right-side up again, its clear wings still furious.
Man grips hard a stick,
Six feet away from wasp nest
clinging to railing
Black sheen, olive green cicada flaps.
Floodlight flips on. Crickets pulse out, a thousand miniscule glass stoppers spun in bottle necks.
Cicada buzzes. It's twitching on its back, its wings pummeling the composite decking, its pale underbelly defenseless.
Cicada flips right-side up again, its clear wings still furious.
Man grips hard a stick,
Six feet away from wasp nest
clinging to railing
Wednesday, August 19, 2015
Haibun
Oxygen Apparatus
Light stays steady through the day's phases, through the night. The rectangular gunmetal door handles show every fingerprint. On the foamboard ceiling, a metal track describes an arc around the bed. A plasticized fabric curtain is suspended therefrom on rings, bunched at one end of the track, near the glistening porcelainesque sink. The woman on the bed, soaked in sweat, grunts and strains. From behind behind a McPainting that a 20 year-old nurse slides aside appears oxygen apparatus: rubber hoses and plastic mask.
The doctor pulls, one
hand on the device, one braced
against stainless steel
Light stays steady through the day's phases, through the night. The rectangular gunmetal door handles show every fingerprint. On the foamboard ceiling, a metal track describes an arc around the bed. A plasticized fabric curtain is suspended therefrom on rings, bunched at one end of the track, near the glistening porcelainesque sink. The woman on the bed, soaked in sweat, grunts and strains. From behind behind a McPainting that a 20 year-old nurse slides aside appears oxygen apparatus: rubber hoses and plastic mask.
The doctor pulls, one
hand on the device, one braced
against stainless steel
Subscribe to:
Posts (Atom)